Thursday, May 13, 2021
News
0 : 0 - 2020/09/15 - Review : 133
Transportation of 4 million tons of pellets from central iron ore of Iran
Transportation of 4 million tons of pellets from central iron ore of Iran
Transportation of 4 million tons of pellets from central iron ore of Iran
In order to increase loading and optimal use of existing capacities, the Director General of Yazd Railway visited the Central Iran-Bafgh Iron Ore site.
According to the public relations of Yazd General Administration of Railways, in order to increase loading, optimal use of existing capacities and review the loading process, the General Manager of Yazd Railway together with the Bafgh Terminal Manager and other railway officials and the company during a meeting Bafgh discussed with the CEO of the company.
In addition, providing an empty wagon to transport concentrate to increase the loading and development of the forest station and relocating the station building for significant access to the iron ore stored at the site was one of the issues raised in the meeting.
It should be noted that due to the reduction of Choghart mine reserves to iron ore, it was decided to compensate the supply of load from the surrounding mines so that the equipment of the new site would be completed and the operation would be completed.
It is worth mentioning that about 4 million tons of pellets are produced annually in Choghart mine, which, considering the changes in the site and in order to compensate for the load deficit, the loading steps will be provided from Seh Chahun station.
It should be noted that the Central Iran Iron Ore Mines Company is the largest producer of granulated iron ore in the country during the last 40 years, which is located 10 km northeast of Bafgh and 120 km southeast of Yazd
rating
average value:0 rated count:0

View Opinions (Idea Numbers 0
Send Opinions
name  
From    
شماره تلفن
comment    
خواندن کد امنیتی تغییر کد امنیتی  
Security Code  
 
All rights reserved by The Railways of Islamic Republic of Iran
Powered by DorsaPortal